Our new Pavilion!

After a substantial donation by the Frost family; construction on the pavilion at the LOCC has begun. The pavilion roof has been installed.  The block house will be finished in the fall.  Remaining work will contiue through 2023.

Our pavilion progress

The pavilion includes a 32′ x 84′ roof with a poured concrete floor.  Additionally there will be a 30′ 6″  x 24′ building that will house a kitchen, two bathrooms, a storage room and bonus area second floor.
Construction underway!

Kitchen Interior

Block House is up!

First floor concrete block is up.  Framing of upper floor starting soon.

Front View

Side view

The structure is on the back right corner of the LOCC property. This area was used for a cell phone tower several years ago.

The red pin is the pavilion area

Design Drawings

These designs act as a guide only. They are not intended as blueprint level drawings.

THEY ARE A WORK IN PROGRESS!
Construction Phases: 1)Pole/metal truss roof 2)Pad plumbing 3)Pour concrete pad 4)Block building 5)Cieling/floor 6)Electrical, LAN, Interior plumbing 7)Second Floor

Ground Work

Inputs and outputs

Bottom faces U.S. Hwy 127

First Floor 

Detail of fixtures
Planning stage

First Floor Llighting

Lighting and related items 
Planning Stage

Second Floor

Conference Room, Control Room
Planning Stage 

Bottom faces U.S. Hwy 127