Our new Pavilion!
After a substantial donation by the Frost family; construction on the pavilion at the LOCC has begun. The pavilion roof has been installed. The block house will be finished in the fall. Remaining work will contiue through 2023.
Our pavilion progress
The pavilion includes a 32′ x 84′ roof with a poured concrete floor. Additionally there will be a 30′ 6″ x 24′ building that will house a kitchen, two bathrooms, a storage room and bonus area second floor.
Construction underway!
Kitchen Interior
Block House is up!
First floor concrete block is up. Framing of upper floor starting soon.
Front View
Side view
The structure is on the back right corner of the LOCC property. This area was used for a cell phone tower several years ago.
The red pin is the pavilion area
Design Drawings
These designs act as a guide only. They are not intended as blueprint level drawings.
THEY ARE A WORK IN PROGRESS!
Construction Phases: 1)Pole/metal truss roof 2)Pad plumbing 3)Pour concrete pad 4)Block building 5)Cieling/floor 6)Electrical, LAN, Interior plumbing 7)Second Floor
Ground Work
Inputs and outputs
Bottom faces U.S. Hwy 127
First Floor
Detail of fixtures
Planning stage
First Floor Llighting
Lighting and related items
Planning Stage
Second Floor
Conference Room, Control Room
Planning Stage
Bottom faces U.S. Hwy 127